All 18trades in the platform, in plain English. For each one: how it’s normally measured (the question to answer first), what an estimator prices, and the checks that catch the expensive mistakes. This is the same content that fills the estimator’s worksheet — so learning it here is learning the tool.

Site & groundworks

Excavation & Earthworks

Measured by: Volume of cut and fill (m³), from the site levels

What’s pricedUnitWastageCheck before pricing
Site strip / topsoil removalm²——
Bulk excavation to levelm³—Confirm depth against the engineer’s footing detail.
Detailed excavation to footingsm³——
Cart away spoilm³25%Bulking factor — excavated soil occupies more volume than in situ.
Imported fill, placed and compactedm³10%—

Concreting & Slab

Measured by: Slab area (m²) and concrete volume (m³)

What’s pricedUnitWastageCheck before pricing
Sand / crushed rock beddingm³10%—
Vapour barrier membranem²10%Include laps and upturns.
Reinforcement meshm²10%Mesh type per engineer. Include laps.
Edge / beam reinforcement bartonnes5%—
Concrete supplym³5%Confirm strength grade from the structural notes.
Formwork to slab edgelineal m5%—
Concrete pump hireeach—Depends on site access.
Place, screed and finishm²——

Stormwater & Sewer Drainage

Measured by: Lineal metres of pipe by diameter, plus pit count

What’s pricedUnitWastageCheck before pricing
Trenchinglineal m——
Pipework, supply and laylineal m5%—
Pits and grateseach——
Connection to legal point of dischargeeach——

Structure

Carpentry — Framing

Measured by: Floor area (m²) for labour; lineal metres by member for materials

What’s pricedUnitWastageCheck before pricing
Bearers and joistslineal m10%—
Wall framingm²10%Measured on wall face area.
Roof trusses, supplyeach—From the truss layout. Confirm span and spacing.
Roof frame erectionm²——
Lintelseach——
Bracing and tie-downseach5%Per AS 1684 bracing schedule.

Bricklaying & Blockwork

Measured by: Wall face area (m²), converted to brick count

What’s pricedUnitWastageCheck before pricing
Bricks, supplyeach5%Standard AU brick ≈ 50/m² single skin. Confirm the format.
Bricklaying labourm²——
Sand and cementm³10%—
Wall ties and accessorieseach5%—
Steel lintelslineal m5%Galvanised within 1km of the coast.
Acid wash and clean downm²——

Envelope — roof, walls, weatherproofing

Roofing — Metal

Measured by: Roof surface area (m²) — plan area ÷ cos(pitch). See roofGeometry.ts

What’s pricedUnitWastageCheck before pricing
Roof sheetingm²11%Cutting waste from nesting; ~10.9% on the reference job.
Ridge cappinglineal m5%—
Hip cappinglineal m5%—
Valley gutterlineal m5%—
Barge cappinglineal m5%—
Gutterlineal m5%—
Fascialineal m5%—
Downpipeslineal m5%Sizing per catchment — VBA Plumbing Practice Note RP-06.
Roof battenslineal m5%—
Sarking / insulation blanketm²10%—
Sundry flashingslineal m10%—

Waterproofing

Measured by: Area of wet-area floors and walls (m²)

What’s pricedUnitWastageCheck before pricing
Primerm²5%—
Membrane, two coatsm²10%—
Bond breaker to junctionslineal m10%—
Angle fillet / reinforcing tapelineal m10%—

Insulation

Measured by: Wall and ceiling area (m²) by R-value

What’s pricedUnitWastageCheck before pricing
Ceiling battsm²5%R-value from the energy rating report.
Wall battsm²5%—
Underfloor insulationm²5%—

Services — electrical, plumbing, HVAC

Electrical

Measured by: Point count from the electrical plan, plus cable runs (m)

What’s pricedUnitWastageCheck before pricing
Power points (GPO)points——
Light pointspoints——
Switchespoints——
LED downlights, supply and installeach2%—
Exhaust fanseach—25 L/s required to wet areas per NCC.
Smoke alarms, interconnectedeach—Hardwired with battery backup, AS 3786.
Switchboard and mainseach——
Cablelineal m10%—
Data / comms pointspoints——
Rough-in labourhours——
Fit-off labourhours——

Plumbing

Measured by: Fixture count, plus pipe runs (m) by diameter

What’s pricedUnitWastageCheck before pricing
Fixtures, supply and installeach——
Water pipeworklineal m10%—
Waste and vent pipeworklineal m10%—
Hot water systemeach——
Tempering valveeach——
Rough-in labourhours——
Fit-off labourhours——

HVAC & Air Conditioning

Measured by: Heating/cooling load (kW) and outlet count

What’s pricedUnitWastageCheck before pricing
Unit, supplyeach—Sized from the heat load calculation.
Ductinglineal m10%—
Outlets and grilleseach——
Installation labourhours——

Solar PV & Battery

Measured by: System size (kW) and panel count

What’s pricedUnitWastageCheck before pricing
PV panelseach——
Invertereach——
Mounting systemeach5%Rail type depends on the roof profile.
Battery storageeach——
Installation labourhours——

Finishes

Plastering & Plasterboard

Measured by: Wall and ceiling area (m²)

What’s pricedUnitWastageCheck before pricing
Plasterboard sheetsm²10%—
Wet-area boardm²10%—
Cornicelineal m10%—
Fixing labourm²——
Setting and sandingm²——
Jointing compound and tapem²5%—

Wall & Floor Tiling

Measured by: Tiled area (m²), separated by wall and floor

What’s pricedUnitWastageCheck before pricing
Tiles, supplym²10%Raise to 15% for diagonal or patterned layouts.
Adhesivem²5%—
Groutm²5%—
Laying labourm²——
Trims and edgeslineal m10%—
Silicone to junctionslineal m5%—

Painting & Decorating

Measured by: Surface area (m²) by coat and substrate

What’s pricedUnitWastageCheck before pricing
Preparation and fillingm²——
Sealer / undercoatm²5%Typical spread rate 12–16 m²/L — confirm the product.
Walls, two coatsm²5%—
Ceilings, two coatsm²5%—
Doors, frames and trimlineal m5%—
External paintm²10%—

Flooring

Measured by: Floor area (m²) by finish type

What’s pricedUnitWastageCheck before pricing
Underlaym²5%—
Timber / laminatem²8%—
Carpetm²10%Broadloom waste depends on roll width vs room shape.
Vinyl / hybridm²8%—
Skirtinglineal m10%—
Laying labourm²——

Cabinetmaking & Joinery

Measured by: Lineal metres of cabinetry, plus benchtop area

What’s pricedUnitWastageCheck before pricing
Base cabinetslineal m——
Overhead cabinetslineal m——
Tall units / pantryeach——
Benchtopm²10%Stone is cut from slabs — waste depends on slab yield.
Hinges, runners and handleseach2%—
Installation labourhours——

Doors & Hardware

Measured by: Door count from the door schedule

What’s pricedUnitWastageCheck before pricing
Internal doorseach——
External doorseach——
Door frames / jambseach——
Locks and furnitureeach——
Hanging laboureach——

Wastage percentages are conventional trade allowances to edit, not standards — every one is adjustable in the estimator. Rates are never shown here or anywhere in the platform: they’re your own commercial data, and a made-up rate that looks authoritative is worse than a blank one.